Much of the stormwater infrastructure in the Bay Area is aging and local jurisdictions are working to rehabilitate and upsize systems to ensure adequate drainage. The condition of the Baylands Pump Station No. 2 and the associated outfalls to Calabazas Creek led the City of Sunnyvale to embark on the planning, environmental review, and permitting process for its rehabilitation. The mechanical equipment at the pump station was reaching the end of its useful life and 100-year storm flows could only be accommodated under optimal conditions.

In 2013, the City approved upgrades to the existing pump station structure and drainage basin on City property and the outfalls to the creek. DJP&A completed the Initial Study for the project and also assisted the City with regulatory permitting. Rehabilitation of the outfalls to Calabazas Creek and impacts to wetlands within the wet well ultimately required permits from CDFW, USACE, and RWQCB.

Sign up to receive our newsletter

David J. Powers & Associates, Inc.

Environmental Consultants and Planners

San Jose (Main) Office

1871 The Alameda, Suite 200
San Jose, CA 95126
Phone: (408) 248-3500
Email: info@davidjpowers.com

Oakland Office

1736 Franklin Street, Suite 400
Oakland, CA 94612
Phone: (510) 902-5850
Email: wburns@davidjpowers.com

© 2025 David J Powers & Associates, Inc. All rights reserved.